Task Report for Week 7 (11th April to 17th April)

=================================================

 

For the Team

============

1. Total for Members:

---------------------

  Carol Sin Yi Poon:            17.80

  Dom Mendonca:                  9.50

  Ho-Jung Simon Youn:            9.00

  Jian Alan Huang:              13.00

  Masyuri Jaya Tjhandana:        7.00

  Nathaporn Eiamvittayakorn:     7.65

  Wendy Wai-Tak Tsang:          10.25

 

ATTENTION: There are still a few people who have not been using NetOffice for

logging there hours properly. Remember, when you finish a task, you need to

both:

        1. log your total time spent on the task, and

        2. change the status of a task to "complete"

 

2. Summary of Tasks

-------------------

 ID Task Name                                                    Expect  Actual

 

 25 Research - Speech/Voice Recognition and TTS                    4       1.15

 34 Agent article - Wooldridge                                     2       2.15

 49 Copy of Agent presentation to complement live demo             4       4

 55 Agent presentation meeting                                     1       1

 56 Schedule meeting times for 12-18 April                         0.3     0.45

 61 Risk Subteam Meeting Preparation                               1       1

 67 Modify Agent Presentation Slides                               1.3     1

 68 Workshop                                                       3       2

 74 Risk Subteam Meeting                                           1       3.3

 75 Risk Subteam Meeting Minute                                    1       1.3

 76 Decision Log and PIP                                           1       0.45

 77 Update Risk Log                                                1       1

 78 Risk Subteam Meeting Agenda                                    0.15    0.15

 48 Agent presentation to complement live demo                     4       4.5

 69 Selective Communication between bluetooth devices              5       5

 54 Copy of Selective Communication between bluetooth devices      5       0

 35 SCMP document                                                  5       3

 40 SPMP Modification -- Rework on the Evil Points Policy Section  1       0

 51 Research using .NET to do bluetooth comms                      3       6

 53 Selective Communication between bluetooth devices              5       0

 38 SPMP Modification -- Modify Process Model Section              2       2

 50 SPMP Modification -- Go throught the whole document            5       5

 65 Add common directory in Document Directory                     0.5     1

 70 Enabling Cross-Document Referencing                            1       1

 42 External review of SPMP                                        5       7

 41 SPMP Modification -- Adding Roles Creation Procedures          1       0

 44 Structure for SVVP Document                                    3.5     3.85

 62 Research on SVVP                                               1       2.75

 47 Script for the prototype demo for Leon                         3       0

 27 Restructure RAP                                                3       0

 36 SCMP Document                                                  5       0

 28 Lodge in Decision log for change of QA leader                  1       1

 31 Project planning for QA team                                   0.75    1

 32 Write roles and responbilitiies for QA leader                  0.5     0.5

 37 Go over SQAP                                                   5       0

 39 SPMP Modification -- Modify Responsibility Section             2       2

 43 Assess PIP form #1                                             1       0.5

 57 QA meeting agenda                                              0.5     0.5

 58 Plan day trip                                                  0.75    0.75

 59 Modify document template                                       0.5     1.5

 60 Submit PIP for change of process SQAP                          1       0

 52 Selective Communication between bluetooth devices              5       0

 

 

FOR the Supervisor

==================

1. Expectation for The Past Week

--------------------------------

a. allocated tasks      : 42

b. allocated hours      : 73.15

 

These data are directly obtained from NetOffice as the number of tasked

allocated during this week and total allocated hours associated with these

tasks.

 

2. Actual Figures

-----------------

a. tasks completed      : 22    (-48%)

b. total hours          : 67.8  ( -7%)

 

These data are also directly obtained from NetOffice as the number of tasked

completed and the number of hours used as logged by team members.

 

3. Expectation for Next Week

----------------------------

a. expected tasks       :

b. expected hours       :

 

I have to wait till this time next week to provide these information.

 

4. Comments

-----------

According to the data obtained from the system, there has been 42 allocated task

and only 22 are completed. The difference is mainly due to people forgetting to

change task status to "complete" when they finish tasks.

 

According to the data obtained from the system, the total worked hours are 67.8

out of 73.15 allocated hours. However, this is not mean we did a good

estimation. It is actually because many people do not update the system when

they finish tasks.

 

Overall, I don't think this week's information is of any use. We need to make

sure people are using the Online Task Tracking System properly first. But by

producing this report, it at least makes us aware of some metrics we can use to

refine our managerial process and also shed a light on what need to be improved.


 

=================================================

Task Report for Week 8 (16th April to 22nd April)

=================================================

 

For the Team

============

1. Total for Members:

---------------------

  Carol Sin Yi Poon:            12.60

  Dom Mendonca:                  9.00

  Glenn Maxwell Fry:            12.00

  Ho-Jung Simon Youn:            7.00

  Jian Alan Huang:              22.00

  Kieran James Simpson:          1.00

  Mei Ling Leong:               27.50

  Nathaporn Eiamvittayakorn:     9.60

  Soon, Saw Ai:                 18.50

  Wendy Wai-Tak Tsang:          18.25

 

 

2. Summary of Tasks

-------------------

 ID Task Name                                                    Expect  Actual

 

 30 Fix up automatic back up script                               0.5     0.5

 52 Selective Communication between bluetooth devices             5

 63 Write SVVP                                                    5       7.1

 64 SPMP post-ext rev modifications, response                     6       5

 65 Add common directory in Document Directory                    0.5     1

 66 Update QA project plan                                        1

 67 Modify Agent Presentation Slides                              1.30    1

 69 Selective Communication between bluetooth devices             5       5

 70 Enabling Cross-Document Referencing                           1       1

 71 SPMP Post External Review Modification and Respons...         2       2.5

 72 SPMP Post External Review Modification and Respons...         2

 73 Rename Files in the Review Directory                          0.5     1

 75 Risk Subteam Meeting Minute                                   1       1.3

 76 Decision Log and PIP                                          1       0.45

 77 Update Risk Log                                               1       1

 78 Risk Subteam Meeting Agenda                                   0.15    0.15

 79 Collecting IEEE Standards                                     0.5

 80 Extend Document Template                                      2

 83 Update Risk Log                                               1       1

 84 Document expired risks                                        0.5     0.5

 85 Email Shirley on Yahoo group address                          0.25    0.25

 86 Update RMP                                                    2       3

 87 Calculate daytrip expenses                                    1       1.5

 88 Research on Speaker Identification and Verificatio...         2       5

 91 Risk Subteam meeting                                          1       1

 93 Preparation for presentation on 21st April (Wed)              1       1

 94 Bluetooth hub research                                        2       2

 95 Post review SCMP modifications                                3       3

 96 Copy of Post review SCMP modifications                        3       3

 97 write QA meeting agenda for 21/04                             1       0.5

 98 Draw out Goal/Environment diagrams and description            3       2

 99 Int rev of SVVP                                               5       6

 102 Risk Subteam Meeting                                         1       1

 103 Send Emails                                                  0.45    0.3

 104 Update Risk Log                                              1       0.3

 105 Risk on Website                                              0.30    0.2

 106 Weekly Project Plan Update                                   3       3

 107 Weekly Task Report                                           2       3

 108 Admin Meeting Preparation                                    2       2

 109 Team Meeting Preparation                                     2       2

 113 Type up minutes of Risk meeting                              1       1

 115 Spying Task                                                  2       2.45

 123 Presentation during Leon's lecture                           0.5     0.5

 124 Attend Research/Requirements Meeting                         0.5     0.5

 126 Create Honour Board                                          1       1.5

 127 Attend Team Meeting                                          1       1

 128 Attend Admin Meeting                                         1       1

 129 Assign tasks for May 7 demo                                  1.5     2

 130 write minutes for reqs/subteams meetings                     2       2

 143 Write STT and TTS program 1                                  2       3.5

 146 Writing an Audit Plan                                        10

 151 Write up Admin Meeting (22/04) minutes                       1       1

 177 Update RMP to include risks on website                       2       2.5

 201 Prepare Risk Presentation for Team Meeting                   1       1

 242 Create README file for research directory                    1       1

                                                                 ---     ---

                                                    Toal Tasks    55      49

                                                    Toal Hours  100.45  89.50

3. Comments

-----------

First of all, since we have changed the task allocation cycle so that, from task

tracking perspective, a week now starts on Friday and ends on Thursday, I

have also provided the task report in this way.

 

Generally, there has been some improvemnts on following the task tracking

process. However, there are still 6 (out of 55) tasks that have not been logged

hours.

 

FOR the Supervisor

==================

Tasks allocated at start of week: No information

Tasks allocated during week:      No information

 

NOTE: Since we just introduced the "Thursday Task Creation" last week, so the

above information can not be provided until this week.

 

Tasks expected to be completed: 55 (100.45 hours exp.)

Tasks actually completed:       49 (89.50 hours exp.)

 

Actual effort spent on completed tasks:   As above 49 (89.50 hours exp.)

Actual effort spent on uncompleted tasks: No information

 

Estimated effort vs actual effort:   100.45 hours vs 89.5 hours = 1.122

 

Comments

--------

From next time onwards, I should be able to provide you with

 

        Tasks allocated at start of week:

        Tasks allocated during week:

 

I don't think the

 

        Actual effort spent on completed tasks:

        Actual effort spent on uncompleted tasks:

 

items are that useful.

 

From next week, I want to change the report to:

 

        Tasks allocated at start of week:

        Tasks allocated during week:

 

        Actual effort spent on completed tasks:

        Actual effort spent on uncompleted tasks:

 

        Estimated effort vs actual effort:

 

This time, the way I got the above information is by dumping the entire database

and directly executing SQL queries on them. I found it easier this way, and it

provides me with rather customised information. I can also reuse those queries

next time. I have also append the queries I have used for you to verify. So you

can trust me on that. :)

 

--------------------------------------------------------------------------------

 

SELECT sum( estimated_time )

FROM `tasks`

WHERE `due_date`

LIKE '2004-04-16%' OR `due_date`

LIKE '2004-04-17%' OR `due_date`

LIKE '2004-04-18%' OR `due_date`

LIKE '2004-04-19%' OR `due_date`

LIKE '2004-04-20%' OR `due_date`

LIKE '2004-04-21%' OR `due_date`

LIKE '2004-04-22%'

 

result = 100.45

 

SELECT count(*)

FROM `tasks`

WHERE `due_date`

LIKE '2004-04-16%' OR `due_date`

LIKE '2004-04-17%' OR `due_date`

LIKE '2004-04-18%' OR `due_date`

LIKE '2004-04-19%' OR `due_date`

LIKE '2004-04-20%' OR `due_date`

LIKE '2004-04-21%' OR `due_date`

LIKE '2004-04-22%'

 

result = 55

 

CREATE TEMPORARY TABLE t1

SELECT task, sum( hours ) AS total

FROM `tasks_time`

GROUP BY task;

 

SELECT count(*)

FROM tasks, t1

WHERE (

tasks.id = t1.task

) AND (

`due_date`

LIKE '2004-04-16%' OR `due_date`

LIKE '2004-04-17%' OR `due_date`

LIKE '2004-04-18%' OR `due_date`

LIKE '2004-04-19%' OR `due_date`

LIKE '2004-04-20%' OR `due_date`

LIKE '2004-04-21%' OR `due_date`

LIKE '2004-04-22%'

)

 

result = 49

 

CREATE TEMPORARY TABLE t1 SELECT task, sum( hours ) AS total

FROM `tasks_time`

GROUP BY task;

 

SELECT sum( total )

FROM tasks, t1

WHERE (

tasks.id = t1.task

) AND (

`due_date`

LIKE '2004-04-16%' OR `due_date`

LIKE '2004-04-17%' OR `due_date`

LIKE '2004-04-18%' OR `due_date`

LIKE '2004-04-19%' OR `due_date`

LIKE '2004-04-20%' OR `due_date`

LIKE '2004-04-21%' OR `due_date`

LIKE '2004-04-22%'

 

result = 89.50


 

=================================================

Task Report for Week 9 (23th April to 29nd April)

=================================================

 

1. Individual Commitment:

-------------------------

  Carol Sin Yi Poon:            26.00

  Dom Mendonca:                 10.50

  Masyuri Jaya Tjhandana:       25.00

  Mei Ling Leong:               20.75

  Glenn Maxwell Fry:            30.25

  Ho-Jung Simon Youn:           18.75

  Kieran James Simpson          15.00

  Quyen Le Quach:               22.75

  Yat Wong:                      4.00

  Jian Alan Huang:              12.00

  Nathaporn Eiamvittayakorn:    16.35

  Soon, Saw Ai:                 11.00

  Wendy Wai-Tak Tsang:          11.00

                                -----

                      Total:   223.35

 

2. Estimation Report:

---------------------

* Tasks allocated at start of week:     58 (Wed and Thu)

* Tasks allocated during week:          63

* Percentage allocated at the start:    48%

 

* Tasks expected to be completed:      121 (245.30 hours exp.)

* Tasks actually completed:            105 (228.60 hours)

 

* Estimated effort vs actual effort:  1.07 (245.30 hours vs 228.60 hours)

 

Comments

--------

Last week was the first week that we decide to try to forecast tasks at the

start of each week, and it turns out that we actually managed to predict 50% of

tasks. Our aim this week is to increase this figure to 60%, and ultimately to

80% at the end of the year.

 

Again, some people still have not been accustomed to use task tracking system

regularly. 12 out of 121 tasks have not been logged any hours, which is not too

bad, but certainly improvable.

 

Time estimate has also been done reasonably well, but the problem I have

identified is the longer the task is, the more likely the prediction is not good

enough, for example:

 

having  "SRS sections 10(expect) 10(actual)" is just one in a million chance.

Tasks like this need to be further decomposed.

 

Kieran note, doing audit for 340 should not be document as a project task. I

know it takes a lot of effort but over the year it is even across everybody. So

the compromise is no one should record this.

 

--------------------------------------------------------------------------------

Appendix

 

Summary of Tasks

----------------

 ID Task Name                                                    Expect  Actual

 

114 Change Risk on Website                                          3      8

121 SRS sections (draft)                                           10     10

122 SRS sections                                                   10

131 Report for reqs team on motion-tracking webcam                  2      0.5

134 Screenshots of PDA program for May 7                            2

138 Hardware request form to Leon, get reply                        1      1

139 Convert VB code to C#                                           5      5

140 Convert VB code to C#                                           5      5

142 Report for reqs team on wireless headset                        2      1.5

147 Process Audit for 340s                                         15     15

149 Research PC; phone communication                                5

150 Read supporting documents on ROADMAP                            5      5.15

152 QA meeting                                                      1

153 Construct audit plan #1 (using SQAP)                            5      4

154 QA meeting                                                      1      1

155 QA meeting                                                      1      1.5

156 QA meeting                                                      1      1.5

157 QA meeting                                                      1      1

158 Admin Meeting                                                   1      1

159 Admin Meeting                                                   1      1

160 Post Internal Review #1 modifications for SVVP                  4      8

161 Admin Meeting                                                   1      1

162 Admin Meeting                                                   1      1

163 Admin Meeting                                                   1      1

164 Admin Meeting                                                   1      1

165 Admin Meeting                                                   1      1

166 Admin Meeting                                                   1      1

167 Admin Meeting Preparation                                       2      4

168 Continue to construct remaining parts of SVVP                   6      2.5

169 Admin Meeting Minutes                                           1      1

170 Read external review report of SCMP                             1      1

171 Read external review report of SCMP                             1      1

172 Post Ext Rev Modifications for SCMP                             3      4

173 Post Ext Rev Modifications for SCMP                             3      3

174 Submit BR form for SCMP Baseline                                0.5    0.5

176 Submit BR form for RAP baseline                                 0.5    1

178 Requirements Meeting                                            1      1

179 Requirements Meeting                                            1      1

180 Requirements Meeting                                            1      1

181 Risk Meeting                                                    1      2

182 Risk Meeting                                                    1      1

183 Meeting with Thomas                                             1      3

185 Meeting with Thomas                                             1      1

186 Preparation for Risk Meeting                                    1.25   1.25

188 Preparation for Risk Meeting                                    1      1

190 Type up Risk meeting minutes                                    1      1

192 Update Risk Log                                                 2      2

214 Propose a refined web udpate procedure                          1      2.5

215 Refine PIP #3, #4                                               0.5    0.5

216 Refine PIP #3, #4                                               0.5    0.75

217 Refine PIP #3, #4                                               0.5    0.5

218 PIP Form Processing                                             2      2.5

219 Honour Board Procedures                                         2      1

220 Update baseline procedures                                      1      1

222 Update Project Calendar                                         0.25   0.25

223 Approach Team Members                                           1.50   0.5

224 PDA subteam: transferring image via bluetooth                   4      6

225 PDA subteam: transferring image via bluetooth                   4      5

227 PDA subteam: research and code to use coredll on X...           5      1

229 PDA subteam meeting                                             1      1

230 PDA subteam meeting                                             1      1

231 PDA subteam meeting                                             1      1

232 PDA subteam meeting                                             1      1

234 Weekly Task Report                                              2      3

235 Read supporting documents on ROADMAP                            5      3

236 Read supporting documents on ROADMAP                            5      4.5

237 Read supporting documents on ROADMAP                            5      4

238 Read supporting documents on ROADMAP                            5      3.5

239 Client Meeting minutes                                          1

241 Implement Individual Available Chart                            3      8

243 External Review of SCMP                                         6      6.3

245 Client Meeting                                                  1      1

246 Client Meeting                                                  1

247 Create a list of scenarios for the client to appro...           3      3

248 Document May Requirements                                       6      7.5

249 Plan for Requirements - when to baseline SRS                    1      1

250 Requirements meeting preparation                                0.5    0.5

251 Write SRS Requirements Section                                 10      5

252 Write SRS Requirements section

254 Encourage team members to think of creative scenar...           0.5    0.25

256 requirements meeting                                            1      1.25

257 Requriement Meeting minutes                                     2      2

258 SRS: Description of the Proposed System                         2      2

259 SRS: Requirements section                                       2      3

261 SRS: Project Deliverables section                               2      1.5

262 SRS: Knowledge Model                                            2

263 SRS: Acceptance                                                 2      2

264 Decision Log                                                    0.25   0.25

265 Create Templaes and Send Email                                  0.30   0.30

266 Prepare Risks to be Assigned                                    1      1.5

270 Preparation for QA meeting                                      1      2.5

271 Type Up Risk Meeting Minutes                                    1      1

272 Create HR Report                                                0.5    0.5

273 Making sure SRS sections are in the right place an...           2      4

274 Collaboration meeting with Thomas and IS people                 1      2

276 Design meeting                                                  1      1

277 Design meeting                                                  1      1

278 Design meeting                                                  1      1

279 Design meeting                                                  1      1

280 Design meeting                                                  1      2

281 Design meeting                                                  1      1

282 Design meeting preparation                                      1      1

283 get bluetooth hub                                               2      2

284 Risk meeting (extra time)                                       1      1

288 Collaboration meeting with Thomas and IS people                 1      1

289 Collaboration meeting with Thomas and IS people                 1      1

290 Research team meeting                                           1      1

291 Research team meeting                                           1      1

292 Research team meeting                                           1      1

293 Research team meeting                                           1      1

295 Research team meeting                                           1      1

296 Research team meeting                                           1      1

307 Design meeting 28/4/04 minutes                                  1      1

309 Research team meeting minutes                                   1      1

310 Assign tasks to design people based on 28 April me...           0.5    0.5

316 QA meeting minute                                               1      1.6

317 log risks identify                                              0.25   0.25

327 SRS high level brainstorming session                            1

342 SRS high level brainstorming session                            1

343 SRS high level brainstorming session                            1

344 Completing and Modifying Risk Website Risk Website              2

                                                                  ---     ---

                                                    Toal Tasks    121     105

                                                    Toal Hours    245.30  228.60


 

=================================================

Task Report for Week 10 (30th April to 6nd April)

=================================================

 

1. Individual Commitment:

-------------------------

  Carol Sin Yi Poon:            13.55

  Dom Mendonca:                 30.50

  Masyuri Jaya Tjhandana:       28.50

  Mei Ling Leong:               19.00

  Yat Wong:                     48.00

  Kieran James Simpson:         10.00

  Jian Alan Huang:              25.00

  Glenn Maxwell Fry:            25.25

  Ho-Jung Simon Youn:           20.00

  Nathaporn Eiamvittayakorn:    21.66

  Quyen Le Quach:               16.75

  Soon, Saw Ai:                 20.00

  Wendy Wai-Tak Tsang:          28.00

                               -------

                      Total:   306.21

 

2. Estimation Report:

---------------------

* Tasks allocated at start of week:     82 (Wed and Thu)

* Tasks allocated during week:          15

* Percentage allocated at the start:    85%

 

* Tasks expected to be completed:      114 (269.50 hours exp.)

* Tasks actually completed:            100 (257.21 hours)

 

* Estimated effort vs actual effort:  1.05 (269.50 hours vs 257.21 hours)

 

Comments

--------

Generally, there is a significant improvement in forecasting tasks at the start

of the week. The percentage has been increased from 50% last week to 80% this

week, which is what we will try to maintain. However, this week's report has

also exposed a number of problems.

 

Firstly, out of 306.21 hours of logged project work, only 257.21 hours are for

the tasks that due in this week. This indicates that people are logging hours

for tasks in previous week(s) that haven't been logged before.

 

Secondly, 14 (114-100) tasks are not completed (still an improvement from last

week though). This is due to either tasks due dates being extended or people

forgetting to change the status to complete.

--------------------------------------------------------------------------------

Appendix

 

Summary of Tasks

----------------

 ID Task Name                                                    Expect  Actual

 

12  SRS: Write up the sections assigned                            5

79  Collecting IEEE Standards                                      1      0.50

80  Extend Document Template                                       3      2.00

132 Face detection and saving image to hard disk progr...          5      4.50

136 Image transfer PC -> ipaq using GUI                        10      3.00

137 Image transfer PC -> ipaq using GUI                        10     12.00

144 Write STT and TTS program 2 with possible voice id            12      6.00

196 RMP Internal Review                                            2      1.75

197 Internal Review #2 of SVVP                                     3      3.00

198 Modify RMP after internal review                               2      2.75

199 Internal Review #2 of SVVP                                     4      3.00

200 Document + Assign Risks to Subteams                            2      0.50

221 Update PIP procedures, modify SQAP a/c to PIP#10, ...          2      3.00

255 PDA subteam: Mobile phone bluetooth research                   3      3.00

267 Update Risks on Website                                        0.50   1.25

268 Research Probability Criteria                                  0.5    0.75

269 Research Impact Criteria                                       0.50   0.75

285 Risk meeting                                                   1      1.00

286 Risk meeting                                                   1      1.25

287 Type up risk meeting minutes                                   1      0.75

299 SADD - Introduction and abstract                               2

300 SADD - methodology used                                        2      2.00

301 SRS Review workshop                                            2      1.50

302 SRS Review workshop                                            2      2.00

303 SRS Review workshop                                            2      1.75

304 SRS Review workshop                                            2      2.00

305 SRS Review workshop                                            2      2.00

306 Organise a meeting with Thomas                                 0.5

308 Talk to Sruti about design involvement                         1      1.00

318 Research Meeting                                               1      0.80

319 Research Meeting                                               1      1.00

320 Research Meeting                                               1      1.00

321 Type up Research meeting minutes                               1      1.00

322 Produce HR Report                                              1.25   0.80

323 Update project calendar                                        0.25   0.25

324 Research on intelligent applications                           1.50   1.25

328 Maintain "The Hounourable Daedalian" boa...          0.50   0.25

329 QA SVVP workshop                                               3      3.00

330 QA SVVP Workshop                                               3      3.00

331 QA SVVP Workshop                                               3      3.00

333 QA SVVP Workshop                                               3      3.00

334 QA SVVP workshop                                               3      2.50

336 QA Meeting preparation                                         0.75

337 QA Meeting preparation                                         0.75

341 Reflect on chairing meetings                                   3      2.00

345 Proof read SCMP                                                1.5    1.00

348 rehursal for May demo                                          1.5

350 Create Video for demonstration                                 3      3.50

351 Weekly Task Report                                             2      2.50

353 Admin Meeting                                                  1      1.50

354 Powerpoint Presentation                                        7     11.00

355 Admin Meeting                                                  1      1.00

356 Admin Meeting                                                  1      1.00

357 Admin Meeting                                                  1      1.00

358 Admin Meeting                                                  1

359 Admin Meeting                                                  1      1.00

360 Integration of all technologies for the May demo               5

361 Admin Meeting                                                  1

362 Admin Meeting                                                  1      1.00

363 Admin Meeting Preparation                                      3      2.00

364 Admin Meeting Minutes                                          1      1.50

365 Audit #1                                                       5      4.50

366 Audit #1                                                       5     13.76

367 Audit #1                                                       5      7.00

368 Audit #1                                                       5      7.50

370 Weekly Backup and Maintain Design Notebook                     1      1.00

372 Weekly Project Plan Update                                     2      2.00

373 Weekly Task Allocation                                         1      1.00

376 Add sub-dir inside Decision_log directory                      0.5    0.25

378 Update Decision logs regarding to QA/Admin decisio...          2      2.50

379 Task creations for the next week                               2      2.00

380 Task creations for the next week                               2      2.00

381 QA project planning                                            1      1.00

383 Convert WinCE code to work on WinXP                            3      3.00

385 Polling to automatically receive images                        4      4.00

386 PDA "location" code for demo                        10     16.00

387 PDA "location" code for demo                        10     16.50

388 May 7th code integration                                       3      2.00

389 May 7th code integration                                       3      4.00

390 May 7th code integration                                       3

396 Prepare 2nd batch of risk to be assigned                       2

397 Preparation for risk meeting                                   1      2.00

398 Preparation for risk meeting                                   1.25   1.25

399 Update Risk Log                                                2      3.00

401 Requirements Meeting                                           1      1.00

402 Requirements Meeting                                           1      1.00

403 Requirements Meeting                                           1      1.00

404 Requirements Meeting                                           1      1.00

405 Requirements Meeting Minutes                                   1      1.00

406 SRS: re-word Intro                                             1      2.00

409 SRS: Requirements 4.1, 4.2                                     2      4.00

411 SRS: To query                                                  2      0.75

412 SRS: To respond                                                2      0.50

416 SRS: To Identify                                               2      1.50

417 SRS: To Recognise                                              2      2.00

420 SRS: Environment Model                                         2      1.00

424 SRS: drawing diagrams                                          2      1.50

428 Measurable Quality metrics for meetings                        0.5    2.00

429 Update individual chart                                        0.50   0.25

430 SRS: fix errors to compile, insert new tex files t...          2      3.00

432 Critique the "To locate" goal model in S...          1.5

433 Critique the "To wake" goal model in SRS             1.5    1.50

434 Critique the "To communicate" goal model...          1.5    1.25

435 Explain output of workshop to Reqs team, write up ...          1      1.00

436 Brainstorm greet goal model                                    2      3.00

437 SRS: Create/Modify goal model diagrams                         2      2.00

438 SRS: Write Descriptions for new goal models                    2      4.00

441 Allocating tasks                                               0.25   0.75

443 QA SCMP Workshop                                               3

444 QA SCMP Workshop                                               3      2.50

445 QA SCMP Workshop                                               3      2.60

446 QA SCMP Workshop                                               3      2.50

447 QA SCMP Workshop                                               3      2.50

502 SRS: put all files together and compile                        3

                                                                  ---    ---

                                                    Toal Tasks    114    100

                                                    Toal Hours   269.50 257.21


 

=================================================

Task Report for Week 11 (7th May to 13rd May)

=================================================

 

1. Individual Commitment:

-------------------------

  Carol Sin Yi Poon:            25.25

  Dom Mendonca:                 24.50

  Masyuri Jaya Tjhandana:       14.50

  Mei Ling Leong:               15.00

  Ho-Jung Simon Youn:           25.25

  Jian Alan Huang:              19.50

  Wendy Wai-Tak Tsang:          28.75

  Glenn Maxwell Fry:            23.00

  Kieran James Simpson:          3.00

  Nathaporn Eiamvittayakorn:    12.30

  Quyen Le Quach:               30.75

  Soon, Saw Ai:                 19.25

  Yat Wong:                      9.00

                                -----

                      Total:   250.05

 

2. Estimation Report:

---------------------

* Tasks allocated at start of week:     79 (Thu and Fri)

* Tasks allocated during week:          89

* Percentage allocated at the start:    47%

 

* Tasks expected to be completed:      168 (279.50 hours exp.)

* Tasks actually completed:            150 (252.05 hours)

 

* Estimated effort vs actual effort:  1.11 (279.5 hours vs 252.05 hours)

 

Comments

--------

One thing to note for this week is that the percentage of tasks allocated at the

start of the week has been decreased to 47% (lowest than any past week.) The

major causes are:

 

  1. planning in some sub-teams are not done ahead of time

  2. many unexpected tasks emerge during the week

  3. task allocation day turns out to be the day before 7th May

 

All of these can be avoid by planning ahead of time. In fact, we should be

planning not only for the coming week, but weeks and months ahead.

 

--------------------------------------------------------------------------------

Appendix

 

Summary of Tasks

----------------

 ID Task Name                                                    Expect  Actual

212 Post Internal Review #2 modifications for SVVP                 4      1.00

213 External review of SVVP                                        5      9.00

298 Skeleton of SADD                                               3      3.00

314 Destroy risk: Failure of May 7th presentation                  2      1.50

325 Research on intelligent applications                           2      2.10

326 Research on intelligent applications                           2      3.00

369 Audit #1                                                       5      3.25

374 Imaging : finalizing may 7th requirements                      5      3.50

382 Planning for audits                                            1      1.00

384 Pre workshop preparation for reviewing audit resul...          2      1.00

396 Prepare 2nd batch of risk to be assigned                       2      1.50

400 Update risk on website                                         1      0.50

407 SRS: Requirements Classification, Assumptions                  1.5    0.50

410 SRS: High level overview                                       2      1.00

413 SRS: To Locate                                                 2      1.00

419 SRS: Description of Goal Models and scenarios                  1      1.00

421 SRS: Knowledge Model                                           2      4.00

422 SRS: Role Model                                                2      5.50

423 SRS: Protocol Model                                            2      2.50

448 Risk meeting                                                   1      1.00

449 Risk meeting                                                   1      1.00

450 Risk meeting minutes                                           1      1.50

451 Preparation for risk meeting                                   1.25   1.50

452 Preparation for risk meeting                                   1.25   1.50

453 Update Risk Log                                                2      2.25

455 Research Summary Report                                        1      0.50

456 Copy of rehearsal for May demo                                 1.5    1.50

457 Copy of rehearsal for May demo                                 1.5    1.00

458 Copy of rehearsal for May demo                                 1.5    2.50

459 Copy of rehearsal for May demo                                 1.5    1.00

460 Copy of rehearsal for May demo                                 1.5    3.50

463 Research on new scenarios                                      4      3.75

464 Research on new scenarios                                      3      2.70

465 Research on new scenarios                                      5      5.00

470 Maintain "The Hounourable Daedalian" boa...          0.25   0.50

471 Update Project Calendar                                        0.25   0.25

472 Produce HR Report                                              1      1.25

473 Update individual chart                                        0.25   0.25

479 Grammar check on RMP                                           1      0.75

480 SVVP changes after walkthrough                                 2.5    1.00

481 SVVP changes after walkthrough                                 2.5    0.50

482 SVVP changes after walkthrough                                 2.5    2.00

483 SVVP changes after walkthrough                                 2.5    1.00

485 Spelling & Grammar Check for SCMP                              2      2.25

488 SCMP changes after walkthrough                                 3      1.50

491 Spelling & Grammar Check for SVVP                              3      4.00

492 Baseline SCMP                                                  0.25   0.25

494 SPMP changes after walkthrough                                 2      2.00

499 SQAP changes after workshop and audit walkthrough ...          5      6.00

503 review of MDRS                                                 2.5    2.50

508 Research Meeting                                               1      1.00

509 Research Meeting                                               1      1.00

510 Research Meeting                                               1      1.00

512 Research Meeting                                               1      1.00

513 Research Meeting                                               1      1.00

514 Research Meeting                                               1      1.00

515 Type up Research meeting minutes                               1      1.00

516 Research on new scenarios                                      8      7.50

517 Research on new scenarios                                      6      2.25

518 Research on new scenarios                                      5      2.00

519 Research on new scenarios                                      8      6.00

520 Tag research reports                                           2      1.50

521 Update risks on website                                        1      0.75

523 Requirements Meeting 11/05                                     1      1.00

525 Requirements Meeting 11/05                                     1      1.25

526 Requirements Meeting 11/05                                     1      1.00

527 Requirements Meeting Preparation                               0.5    1.00

529 Admin Meeting                                                  1      1.50

530 Admin Meeting                                                  1      1.50

532 Admin Meeting                                                  1      1.50

533 Admin Meeting                                                  1      1.25

534 Admin Meeting                                                  1      1.50

538 Admin Meeting                                                  1      1.25

539 SRS: To greet                                                  1      0.75

540 Admin Meeting                                                  1      1.25

541 SRS: To query                                                  1      0.50

542 SRS: To communicate                                            2      2.00

543 SRS: To wake                                                   1      0.75

544 Admin Meeting Preparation                                      2      2.00

545 SRS: To check for schedules                                    1      0.50

547 Admin Meeting Minutes                                          1      1.50

548 SRS: Environment Model                                         1      0.50

553 Weekly Backup and Maintain Design Notebook                     1      1.00

555 SRS: Protocol model descriptions                               2      1.50

556 Weekly Task Allocation                                         1      1.00

557 Audit Walkthrough                                              1      1.00

558 Audit Walkthrough                                              1      1.00

559 Audit Walkthrough                                              1      1.00

561 Audit Walkthrough                                              1      1.00

562 Audit Walkthrough                                              1      1.00

563 Weekly Task Report                                             2      2.00

564 Audit Walkthrough                                              1      1.00

565 Audit Walkthrough                                              1      1.00

567 Audit Walkthrough                                              1      1.00

568 Audit Walkthrough                                              1      1.00

569 Audit Walkthrough                                              1      1.00

570 Audit Walkthrough                                              1      1.00

571 Weekly Project Plan Update                                     2      2.00

573 Weekly Web Site Maintenance                                    2      0.50

574 Copy of The May 7th demo itself                                5      4.00

575 Create Workshop log template                                   0.5    0.50

576 Log SCMP workshop                                              0.5    0.50

578 SRS: high level goals                                          1      1.00

579 SRS: high level goals                                          1      1.00

580 SRS: high level goals                                          1      2.50

581 audit walkthrough                                              2      4.00

582 Create PIP #14                                                 0.25   0.25

585 Create Research templates and Logs                             0.50   0.50

586 Submit PIP                                                     0.50   0.50

587 QA SPMP walkthrough                                            3      3.00

588 QA SPMP walkthrough                                            3      3.00

590 QA SPMP walkthrough                                            3      3.50

591 QA SPMP walkthrough                                            3      3.50

592 QA RAP walkthrough                                             2      2.50

593 QA RAP walkthrough                                             2      2.00

595 QA RAP walkthrough                                             2      2.50

596 QA RAP walkthrough                                             2      2.00

597 Prepare post-walkthrough info to Sub-team leaders              2      1.50

598 Prepare for Architecture Presentation in 440 Lectu...          3      4.00

599 Update Decision Log                                            0.5    0.75

600 Update Decision Log                                            1      0.50

601 Update Decision Log                                            0.5    0.50

602 Update Decision Log                                            0.5    0.50

605 Update Decision Log                                            1      0.75

607 Update Decision Log                                            1      1.00

608 Update Req decision log                                        0.5    0.50

609 Fix up RMP                                                     0.25   0.25

610 Meeting with Mark Brown                                        1      1.00

611 Create spreadsheet for fine collection & team's ac...          0.5    0.75

613 SRS: include relevant requirements sections and co...          2      2.50

614 Design workshop                                                1      1.00

615 Design workshop                                                1      1.00

616 Design workshop                                                1      1.00

623 Design meeting                                                 1      1.00

624 Design meeting                                                 1      1.00

626 Design meeting                                                 1      1.00

627 Design meeting                                                 1      1.00

628 Design meeting                                                 1      1.00

629 Design meeting minutes                                         1      1.00

639 Update logs/templates from SQAP workshop                       1      1.00

640 Update team account                                            0.5    0.50

641 Create risk survey                                             1      1.00

654 Baseline RMP                                                   0.5    0.75

674 Logistics for the May 7th demo                                 3      7.00

675 Keep Kendall informed of outcome of may 7th                    1      1.50

744 Requirements Planning                                          1      1.00

774 Audit walkthrough                                              3      3.00

777 Task allocation                                                2      2.00

778 Research minutes                                               2      2.00

796 Weekly Task allocation 13/05                                   1.5    1.50

                                                                   ---    ---

                                                    Toal Tasks     168    150

                                                    Toal Hours     279.50 252.05


 

=================================================

Task Report for Week 12 (14th May to 20rd May)

=================================================

 

1. Individual Commitment:

-------------------------

  Carol Sin Yi Poon:            23.50  (good point)

  Dom Mendonca:                 24.25  (good point)

  Kieran James Simpson:         11.00  (good point)

  Masyuri Jaya Tjhandana:       41.50  (good point)

  Mei Ling Leong:               23.25  (good point)

  Yat Wong:                     14.50

  Jian Alan Huang:              13.50

  Quyen Le Quach:               29.15  (good point)

  Soon, Saw Ai:                  6.00

  Wendy Wai-Tak Tsang:          14.50

  Glenn Maxwell Fry:            31.25  (good point)

  Ho-Jung Simon Youn:           15.50  (good point)

  Nathaporn Eiamvittayakorn:     9.66

 

                                -----

                      Total:   257.06

 

2. Estimation Report:

---------------------

* Tasks allocated at start of week:     103 (Thu and Fri)

* Tasks allocated during week:          56

* Percentage allocated at the start:    65%

 

* Tasks expected to be completed:       183 (257.65 hours exp.)

* Tasks actually completed:             161 (254.30 hours)

 

* Estimated effort vs actual effort:   1.01 (257.65 hours vs 254.30 hours)

 

3. Comments

-----------

Good news to sub-team leaders: This week's pre-allocation rate is 65%. You guys

have made some steady improvements towards our 80% goal. Keep on going next

week.

 

There have always been a number of tasks unlogged each week, which is quite

annoying at least, regardless of the reasons. Just to remind again, please make

sure that:

 

1. tasks are logged properly and on time.

2. in case there is a slippage, the assigner of the task needs to be notified,

   with the cause of the slippage.

3. in case a task has been cancelled, due to some external or internal reasons,

   such as client meeting being cancelled, the assignee of the task should change

   the status to 'suspend' to make the task outstanding among all overdue tasks.

 

I have decided to, from this week, list all overdue tasks in the report. From

next time, one bad point will be awarded to every occurrence of the names

listed in the overdue tasks list below, if the above three actions have not been

taken. The overdue tasks for last week are:

 

4. Overdue Tasks

----------------

 Task                                   Due Date        Assigned to

 Research Leader Meeting                2004-05-14      Unassigned

 Weekly Project Planning                2004-05-16      hjsy

 External Review Response               2004-05-17      qlq

 Post review SRS modifications          2004-05-18      qlq

 Research scenarios                     2004-05-18      kieranjs

 SRS: Introduction                      2004-05-19      qlq

 SRS: Sketch modified Knowledge Models  2004-05-19      qlq

 Update Decision Log                    2004-05-20      hjsy

 Team Meeting                           2004-05-20      hjsy

 Write up a list of quality goals...    2004-05-20      mlleong

 Minutes for QA meeting on 19/05        2004-05-20      sasoon

 

--------------------------------------------------------------------------------

Appendix

 

Summary of Tasks

----------------

 ID Task Name                                                    Expect  Actual

312 Destory risk: Gap between requirements and design ...          2      1.00

477 Client PDA code for Fernando's location system                 5      4.50

478 Client PDA code for Fernando's location system                 5     10.00

484 Fix up format for section 1 for all documents                  1.5    1.25

522 Fix up AREP                                                    1.5    1.50

554 SRS: Change Request Procedure                                  2      1.50

584 Create Scenarios Document                                      3      7.00

612 SRS External Review                                            5      9.00

618 Knowledge components for goals Ident ify, recogniz...          1      1.00

619 Knowledge components for goals locate, guide                   1      1.00

620 Knowledge components for goals communicate, schedu...          1      1.00

621 Knowledge components for goals wake, query                     1      1.00

622 Knowledge components for goals greet, learn                    1      1.00

630 Write up PIPs, do decision logs                                1      1.00

631 Write up PIP for prototyping/design interaction                1.5    1.50

632 Research application architectures                             2      2.00

633 Research application architectures                             4      3.50

634 read the srs role and protocol models                          0.5    0.50

635 read the srs role and protocol models                          0.5    0.50

636 read the srs role and protocol models                          0.5    1.00

637 read the srs role and protocol models                          0.5    0.50

638 read the srs role and protocol models                          0.5    0.50

643 Complete risk survey                                           0.5    0.50

644 Complete risk survey                                           0.5    0.25

645 Complete risk survey                                           0.5    0.50

646 Complete risk survey                                           0.5    0.25

655 Fix bug on risk website                                        1      5.00

656 Complete risk survey                                           0.5    0.50

657 Complete risk survey                                           0.5    0.25

658 Complete risk survey                                           0.5    0.75

659 Complete risk survey                                           0.5    0.35

660 Complete risk survey                                           0.5    0.50

664 Research Leader Meeting                                        1      1.00

665 Research Leader Meeting                                        1      0.75

666 Research Leader Meeting                                        1      1.00

670 Document Critieria in RAP                                      3      2.00

673 Meeting metrics evaluation                                     2      2.50

676 Scenarios discussion meeting                                   1      1.00

685 Scenarios discussion meeting                                   1      1.00

688 Update Decision Log                                            1      0.25

690 Update Decision Log                                            0.5    1.00

691 Update Decision Log                                            0.5    0.25

692 Update Decision Log                                            0.5    1.00

694 Update Decision Log                                            1      0.75

696 Risk meeting                                                   1      1.00

697 Risk meeting                                                   1      1.00

698 Update Individual Chart, Honour Board and Calendar             1.5    1.50

699 Preparation for risk meeting                                   1      2.50

700 Approach Team Members and Produce HR Report                    1.5    1.50

701 Prepare for risk meeting                                       1      2.25

702 Risk meeting minutes                                           1      1.00

703 Update Risk Log                                                2      1.75

704 Update risks on website                                        0.5    1.00

705 Team Meeting                                                   1      1.00

706 Team Meeting                                                   1      1.00

708 Team Meeting                                                   1      1.00

709 Team Meeting                                                   1      1.00

710 Team Meeting                                                   1      1.00

711 Team Meeting                                                   1      1.00

712 Team Meeting                                                   1      1.00

713 SRS walkthrough                                                4      4.00

714 SRS walkthrough                                                4      4.00

715 SRS walkthrough                                                4      4.00

716 SRS walkthrough                                                4      2.00

717 Team Meeting Preparation                                       2      1.00

719 Admin Meeting Minutes                                          1      1.00

720 Improve risk format on website                                 1      1.00

723 Weekly Project Plan Update                                     2      3.00

724 New Goals Identification/clarification workshop                1      1.00

725 Weekly Project Planning                                        1      2.00

727 New Goals Identification/clarification workshop                1      1.50

728 Weekly Project Planning                                        1      1.00

729 Weekly Project Planning                                        1      0.50

730 New Goals Identification/clarification workshop                1      1.25

731 New Goals Identification/clarification workshop                1      1.00

732 Weekly Web Site Maintenance                                    2      3.50

734 Backup and Collect Hardcopy Design Notebook                    1      1.00

736 Post review SRS modifications                                  6      5.00

737 Weekly Task Report                                             2      2.00

740 Requirements Meeting 18/05                                     1      1.00

741 Requirements Meeting 18/05                                     1      1.00

743 Requirements Meeting 18/05                                     1      1.00

745 Preparation for requirements meeting                           1      1.00

746 Scenarios discussion meeting                                   1      1.00

748 Client Meeting                                                 1      1.50

749 Client Meeting                                                 1      1.50

751 Preparation for client meeting                                 1      1.00

752 Preparation for client meeting                                 0.5    0.50

753 Re-read SRS                                                    1      1.00

754 Re-read SRS                                                    1      1.50

755 Re-read SRS                                                    1      1.00

756 Re-read SRS                                                    1      0.50

757 Re-read SRS                                                    1      1.25

758 Read Research Reports                                          1      1.00

759 Read Research Reports                                          1      1.00

760 Read Research Reports                                          1      1.00

761 Read Research Reports                                          1      1.25

762 Read Review Report                                             1      1.00

763 Read SRS Review Report                                         1      1.50

764 Read SRS Review Report                                         1      0.50

765 Read SRS Review Report                                         1      0.75

766 Read SRS Review Report                                         1      1.25

767 Admin Meeting for Risk Analysis                                1.5    2.00

768 Admin Meeting for Risk Analysis                                1.5    1.75

769 Admin Meeting for Risk Analysis                                1.5    1.50

770 Admin Meeting for Risk Analysis                                1.5    1.50

771 Admin Meeting for Risk Analysis                                1.5    1.75

772 Admin Meeting for Risk Analysis                                1.5    1.75

773 Admin Meeting for Risk Analysis                                1.5    1.50

781 Scenarios Discussion Meeting                                   1      1.00

782 Scenarios discussion meeting                                   1      3.50

783 Client meeting minutes                                         2      2.00

784 Minutes from research subteam leader meeting                   1      1.00

785 Research on Technical Report                                   2      1.50

792 Research scenarios                                             4      2.50

793 Research scenarios                                             4      1.50

795 Enter workshop log                                             0.4    0.40

797 Design Workshop                                                3.5    3.50

800 SRS: ROADMAP Methodology                                       1.5    1.00

801 SRS: Goals section                                             3      4.00

802 SRS: Environment Model                                         1.5    0.75

803 Knowledge Models workshop                                      1      1.75

804 Knowledge Models workshop                                      1      1.75

805 Knowledge Model for "to communicate" goa...          1      0.75

806 Knowledge model for "To check for schedule&qu...          1      0.50

807 Prepare list of scenarios to get client to tick of...          2      4.00

809 SRS: Re-draw protocol models                                   2      2.00

810 SRS: Project deliverables                                      1      5.00

811 Research JACK, present to design team                          3      4.00

812 Research OAA, present to design team                           3      2.00

813 Draw up the layered architecture                               2      3.00

818 Design workshop                                                1      2.00

820 Write up a list of quality goals required in desig...          2      1.00

821 Write up the role models we identified as being re...          1.5    1.50

822 Write up the role models we identified as being re...          1.5    1.50

823 Create V&V task report template                                0.5    0.55

826 COCOMO 2 Usage Research                                        4      5.50

827 Prepare for 440 lecture presentation                           2      2.75

828 Prepare for 440 lecture presentation                           1      1.00

829 Team Meeting Minutes                                           1      1.25

830 Meeting minutes for Req meeting 18/05                          1      1.00

831 Design workshop (for architecture) 5.15                        1      1.00

832 Design workshop (for architecture) 5.15                        1      1.50

833 Design workshop (for architecture) 5.15                        1      0.50

834 Design workshop (for architecture) 5.15                        1      1.00

840 Requirements Meeting 18/05                                     0.75   0.75

841 Analysis of scenarios workshop                                 1      1.00

842 Analysis of scenarios workshop                                 1      1.00

843 Analysis of scenarios workshop                                 1      1.50

844 QA Meeting                                                     1      1.00

845 QA Meeting                                                     1      1.00

846 QA Meeting                                                     1      1.00

847 QA Meeting                                                     1      1.00

848 QA Meeting                                                     1      1.00

850 Send email  to Supervisor on risks questions                   0.5    0.50

852 Team Meeting                                                   1      1.00

853 Team Meeting                                                   1      1.00

854 Team Meeting                                                   1      1.00

855 Team Meeting                                                   1      1.00

856 Help Write up a list of quality goals required in ...          1      0.50

861 Design Workshop                                                1.5    1.50

                                                                   ---    ---

                                                    Toal Tasks     183    161

                                                    Toal Hours     257.65 254.30


 

=================================================

Task Report for Week 13 (21st May to 30th May)

=================================================

 

1. Individual Commitment

------------------------

  Dom Mendonca:                 20.50

  Glenn Maxwell Fry:            17.25

  Masyuri Jaya Tjhandana:       23.50

  Mei Ling Leong:               21.75

  Yat Wong:                     18.00

  Carol Sin Yi Poon:            20.75

  Kieran James Simpson:         12.00

  Ho-Jung Simon Youn:           11.50

  Jian Alan Huang:              17.00

  Quyen Le Quach:               19.25

  Wendy Wai-Tak Tsang:          30.75

  Nathaporn Eiamvittayakorn:    15.15

  Soon, Saw Ai:                 5.00

                                -----

                      Total:    227.4 hours

                      Average:   17.5 hours

 

2. Estimation Report

--------------------

* Tasks allocated at start of week:      59 (Thu and Fri)

* Tasks allocated during week:           53

* Percentage allocated at the start:     53%

 

* Tasks expected to be completed:       169 (280.2 hours exp.)

* Tasks actually completed:             134 (229.41 hours)

 

* Estimated effort vs actual effort:   1.22 (280.2 hours vs 229.41 hours)

 

3. Sub-team Specific Report

---------------------------

                    start of week     during week

                        ----             ----

QA        Tasks           1               12 !!!

Risk      Tasks           6                0

Req.      Tasks           0               20 !!!

Research  Tasks           0                0

Design    Tasks          13                1

Meeting   Tasks          22               19 !!!

Manag.    Tasks          17                1

Coding    Tasks           0                0

Testing   Tasks           0                0

                        ---              ---

                         59               53

4. Overdue Tasks

----------------

 Task                                   Due Date        Assigned to

 Post-walkthrough modifications for RAP 2004-05-22      sasoon

 Logging decisions for use of PIP ...   2004-05-24      sasoon

 Identify any new goals & draw goal ... 2004-05-26      qlq

 QA Meeting (26/05)                     2004-05-26      sasoon

 Admin Meeting                          2004-05-27      masyurit

 Update Decision Log                    2004-05-27      qlq

 Weekly Backup and Maintain Design ...  2004-05-27      sasoon

 Weekly Web Site Maintenance            2004-05-27      masyurit

 Read the reports of the agent ...      2004-05-27      csypoon

 Read the reports of the agent ...      2004-05-27      masyurit

 Modify SRS section: Knowledge Model    2004-05-27      qlq

 Modify SRS section: Role Models        2004-05-27      wwttsang

 QA meeting minutes (26/05)             2004-05-27      sasoon

 final touches to the MDRS              2004-05-28      gmfr

 Trace previous reviews and audits ...  2004-05-28      neiam

 Update risk on website                 2004-05-28      mlleong

 Design workshops                       2004-05-28      masyurit

 Modify and improve SRS section: ...    2004-05-28      masyurit

 Modify and improve SRS section: ...    2004-05-28      masyurit

 Research on quality of documents       2004-05-28      sasoon

 Trace future V&V plans                 2004-05-28      neiam

 Document processes from PIPs into SQAP 2004-05-28      sasoon

 Client Meeting 27/05                   2004-05-28      gmfr

 knonwledge model changes               2004-05-30      gmfr

 

Major Contributors:

 

 sasson         7

 masyurit       6

 qlq            3

 gmfr           3

 

5. Comments

-----------

This week's overdue tasks (or rather "unlogged tasks") are so many (24) that I

don't even want to list. However, I have identified some major contributors

below.

 

 sasson         7 tasks

 masyurit       6 tasks

 qlq            3 tasks

 gmfr           3 tasks

 

I don't think I would issue one bad point to each of the occurrence above, as I

have said last week, otherwise someone's name will be reported to the supervisor

immediately as a result of reaching the "worst" end on the honour board.

However, there shouldn't be any reason for not logging 6 or 7 tasks each week

(which is like the majority of tasks). I would like to hear from the above

people if there is any particular difficulty for using Netoffice, otherwise,

please start logging hours punctually from the next week we resume because it is

a prerequisite, for the task report to be useful, that people are logging

information on hours spent.

 

I was also uncomfortable with the 53% figure representing the tasks allocated

before the start of last week. I went one step further to list this information

based on sub-teams and I also identified some major contributor for this

figure.

 

                    start of week     during week

                        ----             ----

QA        Tasks           1               12 !!!

Risk      Tasks           6                0

Req.      Tasks           0               20 !!!

Research  Tasks           0                0

Design    Tasks          13                1

Meeting   Tasks          22               19 !!!

Manag.    Tasks          17                1

Coding    Tasks           0                0

Testing   Tasks           0                0

                        ---              ---

                         59               53

 

I understand for QA tasks, there is some degree of uncertainty. For instance,

the task of processing a PIP is only initiated when a PIP is submitted. In that

case, I would recommend allocate half hour to every body per week because we

have enough experience to make a reasonable good estimation on this. And this is

the whole point of doing planning and effort estimation. For the Requirement

tasks, I have checked the tasks in details and I couldn't find any evidence to

convince myself that there could possibly be any reason for not allocating even

one task at the start of the week. The requirement sub-team leader should make

sure that this will not happen again.

 

--------------------------------------------------------------------------------

Appendix

 

Summary of Tasks

----------------

 ID Task Name                                                    Expect  Actual

313 Mitigate risk: Poor project planning                           3      1.00

315 Destory risk: Loss of work in individual workspace             3      2.00

371 Post External Review Modifications for SVVP                    5      8.36

393 Destroy Risk 8: Team members do not log risks                  2      0.75

394 Destroy Risk 9: Difficulty in scoping the requirem...          2      1.00

442 final touches to the MDRS                                      2      0.75

493 Construct Configuration Audit Plan                             3      4.50

501 Spelling & Grammar Check for SPMP                              2      2.00

668 Prepare Information Sheet for each member                      3      2.00

672 Audit response                                                 5      2.00

677 Weekly Task Allocation                                         1      1.50

679 Weekly Task Allocation                                         1      0.50

680 Weekly Task Allocation                                         1      1.00

681 Weekly Task Allocation                                         1      1.00

682 Weekly Task Allocation                                         1      1.00

683 Weekly Task Allocation                                         1      0.75

718 Mitigate risk: Uneven distribution of tasks                    2      1.75

722 Track risks assigned                                           1.5    0.50

739 Post review SRS modifications                                  6      5.50

775 Client PDA code for Fernando's location system                 5      1.00

776 Client PDA code for Fernando's location system                 5      6.50

786 Draft of technology report on Voice                            1      1.00

787 Draft of technology report on Imaging                          1      1.00

788 Draft of technology report on PDAs                             1      1.50

789 Research on Configuration Management                           1.5    2.00

790 Learn how to use Mercury                                       5      8.00

799 SRS: Description of the proposed system                        3      2.50

824 Trace previous reviews and audits and document in ...          3      5.50

837 Research JADE, present to design team                          3      3.50

838 Research Cougaar, present to design team                       3      3.00

839 Research KAOS, present to design team                          3      3.00

851 Team Meeting                                                   1      1.00

857 Update Risk Log                                                1.5    1.75

859 Preparation  for risk meeting                                  1      1.25

860 Client meeting                                                 1      1.50

862 Preparation for risk meeting                                   1.5    1.50

863 Risk meeting                                                   1      1.00

864 Risk meeting                                                   1      1.25

865 Risk meeting minutes                                           1      1.00

867 Admin Meeting                                                  1      1.00

868 Admin Meeting                                                  1      1.00

869 Admin Meeting                                                  1      1.00

871 Admin Meeting                                                  1      1.00

872 Admin Meeting                                                  1      2.00

873 Admin Meeting                                                  1      1.00

874 Admin Meeting Minutes                                          1      1.25

875 Admin Meeting Preparation                                      2      1.00

876 Perform cost benefit analysis on 7 risks                       1.25   1.75

877 Update Decision Log                                            0.5    0.25

879 Perform cost benefit analysis on 7 risks                       1.25   1.00

880 Update Decision Log                                            0.5    0.50

881 Update Decision Log                                            0.5    0.50

883 Update Decision Log                                            0.5    0.25

885 Fix up AREP based on risks tracked                             1      1.25

890 Weekly Task Allocation                                         1      0.75

892 Weekly Task Report                                             2      2.00

893 Update Individual Chart, Honour Board and Calendar             1.5    1.25

894 Approach Team Members and Produce HR Report                    1.5    1.25

899 Weekly Web Site Maintenance                                    2      2.00

904 Prepare risks to be assigned                                   1      2.00

907 Update the methodology section of SADD                         2      2.00

908 Find the best agent papers for the design team to ...          1      1.00

909 Read the reports of the agent architectures                    1.5    1.00

910 Read the reports of the agent architectures                    1.5    0.50

911 Read the reports of the agent architectures                    1.5    1.50

914 Read the reports of the agent architectures                    1.5    2.00

915 Research MAST, present to design team                          3      2.50

916 Background reading on agent architectures                      1.5    1.75

917 Background reading on agent architectures                      1.5    2.00

918 Background reading on agent architectures                      1.5    1.00

919 Background reading on agent architectures                      1.5    2.00

920 Background reading on agent architectures                      1.5    1.50

921 Design workshops                                               3      3.00

922 Design workshops                                               4      4.50

923 Design workshops                                               4      5.00

924 Design workshops                                               4      4.00

926 Design workshops                                               3      2.00

928 Requirements Meeting 25/05                                     1      1.00

929 Requirements Meeting 25/05                                     1      1.00

931 Read Scenarios document                                        1      1.00

932 Read Scenarios document                                        1      1.00

934 Read the current SRS                                           1      1.00

935 Read the current SRS                                           1      1.00

936 Read the current SRS                                           1      1.25

937 Read the current SRS                                           1      0.25

941 Identify any new goals & draw goal diagrams from s...          2      2.00

942 Modify SRS section: Knowledge Model                            2      2.00

943 Modify SRS section: Role Models                                2      0.75

948 Client Meeting-SRS feedback                                    1      1.25

949 Client Meeting-SRS feedback                                    1      1.00

950 Client Meeting-SRS feedback                                    1      1.00

951 Client Meeting-SRS feedback                                    1      1.50

954 Construct RAP audit plan                                       2      2.50

956 Construct Managerial Audit Plan                                3      3.00

957 Reply PIP initiators in regards to outcomes                    0.75   0.50

958 Document new processes into SPMP                               2      2.50

964 QA Meeting (26/05)                                             1      1.00

965 QA Meeting (26/05)                                             1      1.00

966 QA Meeting (26/05)                                             1      1.00

968 QA Meeting (26/05)                                             1      1.00

971 Preparation for QA Meeting (26/05)                             1.5    1.75

972 Modify section 2 of PIP 17, 18, 19, 20                         2      1.00

973 Client Meeting Minutes                                         1      1.50

974 Read meeting feedback comments                                 0.5    0.50

976 SRS Workshop 25/05                                             2      2.00

978 SRS Workshop 25/05                                             2      1.50

979 SRS Workshop 25/05                                             2      1.00

980 SRS Workshop 25/05                                             2      1.00

982 Research on Good Agendas                                       3      0.75

983 Construct QA evaluation survey                                 1.5    1.00

1021 Draft of technology report on Imaging                         1      1.00

1023 Research on Configuration Management                          1.5    2.00

1065 Draft of technology report on Imaging                         1      1.00

1067 Research on Configuration Management                          1.5    2.00

1072 Mercury workshop attendance                                   1      1.00

1073 Mercury workshop attendance                                   1      1.00

1074 Mercury workshop attendance                                   1      1.00

1075 Mercury workshop attendance                                   1      1.00

1076 Mercury workshop attendance                                   1      1.00

1077 Mercury workshop attendance                                   1      1.00

1078 Mercury workshop preparation                                  2      2.50

1080 Design tute with Thomas                                       1      1.00

1083 SADD creation                                                 5      4.00

1084 Get back to PIP initiators for PIP 22, 23, 24, 25             0.75   0.75

1085 Decision logs for PIP 22, 23, 24, 25                          1      0.50

1086 SVVP S&G Check prior to baseline                              3      1.50

1088 Trace future V&V plans                                        3      0.35

1089 SQAP S&G check prior to baseline                              2.5    8.00

1091 Document processes from PIPs into SQAP                        2      0.95

1092 knowledge model changes                                       3      5.00

1093 Draw up the role hierarchy                                    0.5    0.50

1094 Modify SVVP interdocumentation cross reference                1.5    1.50

1095 Client Meeting 27/05                                          1      1.00

1098 Design workshop attendance                                    1      1.00

1099 Modify the introduction sections of SRS                       3      3.00

1100 QA meeting minutes                                            1      1.25

1101 Fill in summary report of iteration 1 for SVVR                0.5    0.75

1102 SVVP baseline request and other preparation                   0.45   0.50

                                                                   ---    ---

                                                    Toal Hours     280.2 229.41

 


 

=================================================

Task Report for Week 14 (28st June to 2nd July)

=================================================

 

1. Individual Commitment

------------------------

    Ho-Jung Simon Youn:         16.00

    Mei Ling Leong:             17.25

    Soon, Saw Ai:                5.75

    Yat Wong:                    8.00

    Carol Sin Yi Poon:          15.00

    Dom Mendonca:               16.75

    Jian Alan Huang:            15.00

    Masyuri Jaya Tjhandana:     16.50

    Quyen Le Quach:             11.50

    Wendy Wai-Tak Tsang:        18.25

    Glenn Maxwell Fry:          10.50

    Kieran James Simpson:        1.00

    Nathaporn Eiamvittayakorn:   6.10

                                -----

                      Total:    157.6 hours

                      Average:   12.1 hours

 

2. Estimation Report

--------------------

* Tasks allocated at start of week:      64 (Fri, Sat and Sun)

* Tasks allocated during week:           35

* Percentage allocated at the start:     65%

 

* Tasks expected to be completed:       99 (187.45 hours exp.)

* Tasks actually completed:             75 (128.40 hours)

 

* Estimated effort vs actual effort:   1.46 (187.45 hours vs 128.40 hours)

 

3. Sub-team Specific Report

---------------------------

                    start of week     during week

                        ----             ----

QA        Tasks           8                0

Risk      Tasks           7                1

Req.      Tasks           0                9

Design    Tasks           5                4

Meeting   Tasks          24                9

Manag.    Tasks          12                9

Coding    Tasks           8                1

Testing   Tasks           0                2

                        ---              ---

                         64               35

4. Overdue Tasks

----------------

 Task                                   Due Date        Assigned to

 write up design -> coding team reques  2004-06-29      kieranjs

 Talk to Yuri - Risk Website improvemen 2004-06-30      masyurit

 Research into Learning Design Related  2004-07-01      mlleong

 Research into Learning Design Related  2004-07-01      masyurit

 Mitigate risk: Team members relax too  2004-07-02      csypoon

 Perform cost benefit analysis Risk     2004-07-02      mlleong

 Inspect quality deficiency in SPMP,    2004-07-02      sasoon

 Tracing V&V activities QA Related      2004-07-02      neiam

 Update Decision Log Managerial and HR  2004-07-02      masyurit

 Weekly Web Site Maintenance Managerial 2004-07-02      masyurit

 Internal review of SADD Design Related 2004-07-02      csypoon

 Clarinox device prototyping Coding     2004-07-02      ywong

 Modify the Fernando roaming code to    2004-07-02      ywong

 TAPI prototyping Coding Related Tasks  2004-07-02      ywong

 TAPI prototyping Coding Related Tasks  2004-07-02      gmfr

 Misc prototyping Coding Related Tasks  2004-07-02      gmfr

 Admin Meeting Managerial and HR        2004-07-02      masyurit

 Application tier brainstorming Design  2004-07-02      mlleong

 

5. Comments

-----------

Considering it is holiday now, it is quite impressive we still maintain a level

of commitment towards our project. Since we are expected to work above 20 hours

per week, it is also understandable that it is pretty hard to allocate that

amount of tasks at the start of the week.

 

--------------------------------------------------------------------------------

Appendix

 

Summary of Tasks

----------------

 ID Task Name                                                    Expect  Actual

900 Mitigate risk: Team members relax too much during ...           1     1.50

901 Mitigate risk: Unfamiliar with logic programming l...           2     2.00

1107 Hardware description                                           4     1.50

1108 Location module detailed design                                5     7.00

1111 Write up validation and verification steps we will...          2     1.00

1112 Research into Learning                                         6     3.00

1118 Risk Meeting                                                   1     1.00

1121 Perform cost-benefit analysis                                  3     3.25

1124 Critique the cost-benefit analysis section                     1     1.25

1125 Follow up on Active Risks                                      0.5   0.50

1126 Follow up on Active Risks                                      0.5   1.00

1127 Talk to Yuri - Risk website improvement suggestion...          0.5   0.25

1128 Talk to Yuri - Risk Website improvement suggestion...          0.5   2.00

1132 Design meeting                                                 1     1.50

1133 Design meeting                                                 1     1.00

1134 Design meeting                                                 1     1.00

1135 Design meeting                                                 1     1.00

1137 QA meeting                                                     1.25  1.00

1138 QA meeting                                                     1.25  1.00

1140 QA meeting                                                     1.25  1.00

1141 QA meeting                                                     1.25  1.00

1142 QA meeting minutes                                             1.25  1.00

1143 Read up research template on agenda                            1     0.25

1144 Read PIPs                                                      0.75  0.50

1145 QA meeting preparation                                         1     0.50

1146 QA meeting preparation                                         1     0.25

1148 QA meeting preparation                                         1     0.50

1149 QA meeting preparation                                         1     0.50

1150 Create QA meeting agenda                                       1.5   2.00

1151 Meeting evaluation PIP                                         1     0.50

1152 QA meeting with RM - (in regards to QA related ris...          1     0.75

1153 QA meeting with RM - (in regards to QA related ris...          1     0.75

1154 QA/RM meeting minutes                                          1     1.50

1155 Prepare agenda for QA/RM meeting                               1     0.75

1156 Plan mini audits                                               1.5   1.00

1157 Tracing V&V activities                                         1     0.15

1165 Research into Learning                                         6     3.00

1170 Update Decision Log                                            0.5   0.75

1171 Update Decision Log                                            0.5   0.25

1172 Update Decision Log                                            0.5   0.50

1174 Update Decision Log                                            0.5   0.50

1185 Update Individual Chart, Honour Board and Calendar             1.5   1.50

1186 Approach Team Members and Produce HR Report                    1.5   1.25

1187 Weekly Project Plan Update                                     1     1.00

1188 Weekly Web Site Maintenance                                    1.5   1.50

1189 Backup and Collect Hardcopy Design Notebook                    1     0.50

1192 Internal review of SADD                                        4     4.00

1193 Fix the context tier architecture drawing                      1     0.50

1194 Viavoice research report                                       2     3.00

1196 Coding standards and conventions                               5     4.00

1198 Clarinox device prototyping research                           5     4.50

1204 Requirements Meeting 29/06/04                                  1     1.00

1205 Requirements Meeting 29/06/04                                  1     1.00

1206 Requirements Meeting 29/06/04                                  1     1.00

1207 Requirements Meeting Preparation 29/06/04                      1     1.00

1219 Client Meeting 30/06/04                                        1     1.00

1220 Client Meeting 30/06/04                                        1     1.25

1221 Client Meeting 30/06/04                                        1     1.25

1222 Client Meeting Preparation 30/06                               1     1.00

1223 Requirements Meeting Minutes 29/06/04                          1     1.00

1224 Client Meeting Minutes                                         1     2.25

1225 Client Meeting Minutes Reviewer 30/06/04                       0.5   0.50

1227 Read SRS (before modifications)                                1     1.00

1228 Read SRS (before modifications)                                1     0.75

1229 Read SRS (before modifications)                                1     1.00

1230 Read SS                                                        1     1.00

1231 Read SS                                                        1     0.50

1232 Read SS                                                        1     1.00

1235 Research into agent projects                                   6     7.00

1236 put references and labels in the SADD                          0.5   1.00

1241 Design meeting minutes                                         1     1.00

1245 Admin Meeting                                                  1     1.50

1246 Admin Meeting                                                  1     1.50

1247 Admin Meeting                                                  1     1.00

1249 Admin Meeting                                                  1     1.00

1250 Admin Meeting                                                  1     1.50

1251 Admin Meeting                                                  1     1.50

1252 Admin Meeting Minutes                                          1     1.00

1253 Requirements Meeting Minutes 29/06/04                          1     1.25

1255 Research into writing to file in PhP                           1     0.50

1260 Application tier brainstorming                                 3     2.50

1261 Analysis of high level goals workshop                          2     2.00

1262 Analysis of high level goals workshop                          2     3.00

1263 Analysis of high level goals workshop                          2     2.00

1264 research on thread in c#                                       5     5.00

1265 xml format for system request                                  2     2.00

1277 Meeting  minute                                                1     1.00

1278 log identified risk                                            0.20  0.25

1391 Research on TP Structure and read articles on Test...          2     2.00

 

                                                Difference Variance       0.35

                                                 Average Difference       0.40


 

=================================================

Task Report for Week 15 (3rd July to 9th July)

=================================================

 

1. Individual Commitment

------------------------

  Glenn Maxwell Fry:            30.50

  Ho-Jung Simon Youn:           15.25

  Masyuri Jaya Tjhandana:       26.00

  Soon, Saw Ai:                 10.75

  Yat Wong:                     13.00

  Carol Sin Yi Poon:            15.50

  Dom Mendonca:                 15.00

  Jian Alan Huang:              19.00

  Mei Ling Leong:                9.75

  Quyen Le Quach:               28.60

  Wendy Wai-Tak Tsang:          41.25

  Kieran James Simpson:          0.00

  Nathaporn Eiamvittayakorn:    37.15

                                -----

                      Total:   261.75 hours

                      Average:  20.13 hours

 

2. Estimation Report

--------------------

* Tasks allocated at start of week:      72 (Fri and Sat)

* Tasks allocated during week:           12

* Percentage allocated at the start:     86%

 

* Tasks expected to be completed:      127 (257.75 hours exp.)

* Tasks actually completed:            124 (252.60 hours)

 

* Estimated effort vs actual effort:  1.02 (257.75 hours vs 252.60 hours)

 

3. Sub-team Specific Report

---------------------------

                    start of week     during week

                        ----             ----

QA        Tasks          14                0

Risk      Tasks           0                0

Req.      Tasks          27                3

Design    Tasks           0                1

Meeting   Tasks          11                0

Manag.    Tasks           0                0

Coding    Tasks          16                0

Testing   Tasks           5                8

                        ---              ---

                         73               12

4. Overdue Tasks

----------------

 Task                                   Due Date        Assigned to

 Inspect quality deficiency in SCMP     2004-07-09      sasoon

 Bluetooth tech request                 2004-07-09      ywong

 Face recognition tech request          2004-07-09      ywong

 

5. Comments

-----------

 

 

--------------------------------------------------------------------------------

Appendix

 

Summary of Tasks

----------------

 ID Task Name                                                    Expect  Actual

902 Mitigate risk: Bad design architecture                         3      4.50

1110 Application tier roles                                        5      2.50

1117 Risk Meeting                                                  1      1.00

1159 Management Audit                                              3     11.00

1160 Management Audit                                              4      4.50

1161 Management Audit                                              9      8.20

1162 RAP Audit                                                     4      3.00

1163 RAP Audit                                                     5      7.50

1169 Inspect quality deficiency in SQAP                            2      6.00

1177 Weekly Task Allocation                                        1      0.75

1178 Weekly Task Allocation                                        1      2.00

1179 Weekly Task Allocation                                        1      1.00

1180 Weekly Task Allocation                                        1      1.00

1181 Weekly Task Allocation                                        1      0.25

1182 Weekly Task Allocation                                        1      1.00

1183 Weekly Task Allocation                                        1      1.00

1184 Weekly Task Report                                            2      2.00

1191 Weekly Project Planning and Analysis                          2      2.00

1195 install Visual Source Safe and NgSource                       3      2.00

1197 Coding standards and conventions                              3      1.50

1208 SRS: Introduction                                             2      2.00

1209 SRS: Quality Goals                                            1      1.00

1210 SRS: Description of the Proposed System                       2      2.00

1211 SRS: Project Domain                                           0.25   0.25

1212 SRS: Methodology                                              2      2.00

1213 SRS: Goal Models of the System                                2.5    1.00

1215 SRS: Knowledge Models                                         2      2.25

1216 SRS: Role Models                                              2      1.00

1217 SRS: Protocol Models                                          2      1.00

1218 SRS: Appendix                                                 1.5    1.75

1226 SRS: compile document for review                              1      0.25

1254 Description of the existing system                            2      2.50

1256 Oversee completion of delegated tasks                         4      2.00

1257 Application tier brainstorming                                3      4.75

1258 Application tier brainstorming                                3      7.00

1259 Application tier brainstorming                                3      2.50

1266 Research on Testing Techniques                                4      3.50

1267 Research on Testing Tools                                     4      4.00

1268 Research on Testing Methodology                               3      3.00

1269 Read book and research on Testing Techniques                  2      3.15

1270 Researching on Testing Tools                                  3      4.80

1271 Research on Database Testing and Bug Tracking Tool...         4      4.00

1272 Research on Testing Tools and Exception Testing Te...         4      3.25

1274 Research on Boundary Value Testing, Pareto Analysi...         4      3.00

1275 Research on Testing Types                                     2      2.00

1276 TP Document Creation                                          3      1.00

1284 Management Audit Workshop                                     2      2.00

1285 Management Audit Workshop                                     5      2.50

1286 Management Audit Workshop                                     5      2.45

1287 Management Audit Workshop                                     2      3.00

1288 Management Audit Workshop                                     5      2.50

1289 RAP Audit Workshop                                            2      2.00

1290 RAP Audit Workshop                                            2      2.00

1291 RAP Audit Workshop                                            2      1.35

1292 RAP Audit Workshop                                            2      1.50

1293 RAP Audit Workshop                                            2      1.75

1294 Create checklist for quality of documents                     1      0.50

1295 Document new PIP procedures in documents                      2      2.25

1296 Audit response for Management Audit                           2      2.05

1304 Bluetooth tech request                                        8      5.00

1305 Function to play mp3/wav file tech request                    3     10.00

1306 Coding team meeting                                           1      1.00

1307 Coding team meeting                                           1      1.00

1308 Prototyping team meeting                                      1      0.75

1309 Prototyping team meeting                                      1      1.00

1310 Meeting minutes                                               1      0.50

1311 Design Walkthrough                                            2      1.00

1312 Design Walkthrough                                            2      1.50

1313 Design Walkthrough                                            2      0.50

1314 Design Walkthrough                                            2      1.00

1315 Familiarise yourself with OpenCV face recog softwa...         2      2.00

1317 Meeting preparation                                           1      0.50

1318 Bluetooth (Clarinox) tech request                             5      2.00

1320 Read SADD, Jade research report                               1      1.00

1326 directing high level goal (diagram plus descriptio...         1      1.50

1327 Instances of directing (diagrams plus descriptions...         1      1.50

1328 write steps to verify goal: communication                     0.5    0.75

1329 Add soft goals to goal model: communication                   0.5    0.75

1330 write steps to verify goal: locating                          0.5    0.50

1331 Add soft goals to goal model: locating                        0.5    0.50

1332 write steps to verify goal: guiding                           0.5    0.75

1333 Add soft goals to goal model: guiding                         0.5    0.50

1334 Role hierarchy (use stick figures)                            1      1.00

1335 Provide home security/integrity high level goal               1      1.00

1336 Instances of home security/integrity                          1      0.50

1337 write steps to verify goal: scheduling                        0.5    0.75

1338 Add soft goals to goal model: scheduling                      0.5    0.50

1339 write steps to verify goal: recording                         0.5    0.50

1340 Add soft goals to goal model: recording                       0.5    0.50

1341 create extra tex files: description of current sys...         0.5    0.50

1342 restructure srs                                               0.5    0.50

1343 system level goals (L0)                                       1      2.00

1344 schedule confirmation high level goal                         1      2.00

1345 Instances of schedule confirmation                            2      2.50

1346 write steps to verify goal: detection                         0.5    0.25

1347 Add soft goals to goal model: detection                       0.5    0.60

1348 write steps to verify goal: identification                    0.5    0.25

1349 Add soft goals to goal: identification                        0.5    0.50

1354 Read quality goals of SADD                                    0.5    0.25

1355 Review SRS                                                    3      3.50

1356 Review SRS                                                    3      2.50

1357 Review SRS                                                    3      3.50

1380 Admin Meeting                                                 1      1.00

1381 Admin Meeting                                                 1      1.00

1382 Admin Meeting                                                 1      1.00

1383 Admin Meeting                                                 1      1.00

1384 Admin Meeting                                                 1      1.00

1385 Admin Meeting                                                 1      1.00

1386 Admin Meeting                                                 1      1.00

1387 Admin Meeting                                                 1      1.00

1388 Admin Meeting Minutes                                         1      1.25

1389 Admin Meeting Preparation                                     2      2.00

1392 Writing Minutes                                               1      1.00

1393 Research on Testing Techniques and Testing Artefac...         4      4.00

1394 Make changes to SADD                                          5     12.00

1395 Review Response Workshop                                      3      1.50

1396 Review Response Workshop                                      3      2.00

1397 Review Response Workshop                                      3      2.00

1419 Writing Minutes                                               1      1.25

1420 Testing Meeting                                               1      1.00

1421 Testing Meeting                                               1      1.00

1422 Testing Meeting                                               1      1.00

1423 Testing Meeting                                               1      1.00

1438 Testing Meeting                                               1      1.00

 

 

                                                Difference Variance       2.36

                                                 Average Difference       0.03


 

=================================================

Task Report for Week 16 (10th July to 16th July)

=================================================

 

1. Individual Commitment

------------------------

 

  Glenn Maxwell Fry:             7.25

  Ho-Jung Simon Youn:           16.50

  Soon, Saw Ai:                  8.85

  Yat Wong:                      7.50

  Carol Sin Yi Poon:            29.00

  Dom Mendonca:                 23.25

  Jian Alan Huang:              27.50

  Kieran James Simpson:         17.50

  Masyuri Jaya Tjhandana:       33.00

  Mei Ling Leong:               40.75

  Nathaporn Eiamvittayakorn:    34.89

  Quyen Le Quach:               25.00

  Wendy Wai-Tak Tsang:          26.25

                                -----

                      Total:   297.24 hours

                      Average:  22.80 hours

 

2. Estimation Report

--------------------

* Tasks allocated at start of week:      99 (Fri and Sat)

* Tasks allocated during week:           25

* Percentage allocated at the start:     80%

 

* Tasks expected to be completed:      170 (341.5 hours exp.)

* Tasks actually completed:            153 (305.20 hours)

 

* Estimated effort vs actual effort:  1.11 (341.5 hours vs 305.20 hours)

 

3. Sub-team Specific Report

---------------------------

                    start of week     during week

                        ----             ----

QA        Tasks          35                0

Risk      Tasks           9                0

Req.      Tasks           4                0

Design    Tasks          15               23

Meeting   Tasks          13                0

Manag.    Tasks           0                0

Coding    Tasks           7                1

Testing   Tasks          16                1

                        ---              ---

                         99               25

4. Overdue Tasks

----------------

 Task                                   Due Date        Assigned to

 List of responsibilities for each role 2004-07-13      hjsy

  Testing Workshop                      2004-07-14      masyurit

  Destroy Risk: Team members not        2004-07-16      neiam

  Mitigate risk: Human Resource Conflic 2004-07-16      jhua

  Evaluate jade                         2004-07-16      jhua

  Evaluate 3apl                         2004-07-16      csypoon

  Audit Response for Configuration Audi 2004-07-16      sasoon

  Modifications for SCMP after audit    2004-07-16      sasoon

  CVS .NET code check in                2004-07-16      sasoon

  DECAF tech request                    2004-07-16      sasoon

  Admin Meeting                         2004-07-16      masyurit

  Detailed design on "Guider"           2004-07-16      jhua

  Internal review of SADD               2004-07-16      jhua

 

 

5. Comments

-----------

While other people are having holidays, I am very please that we have worked

297.24 hours in total for our project last week, which is 22.80 hours per person

in average. Some people, like Yuri, Nat and MeiLing have even worked for over 30

hours!! Meiling is even 40 hours. (You really think yourself as full time?) I am

very pround of you guys and I think all of us should be pround.

 

I have to confess that I have 4 tasks overdue last week. There are 11 tasks due

on 16th that hasn't been logged, which I guess is partially because of the crash

of the server.

 

--------------------------------------------------------------------------------

Appendix

 

Summary of Tasks

----------------

 ID Task Name                                                    Expect   Actual

395 Destroy Risk: Team members not following processes             2       3.70

1120 Risk Meeting Minutes                                          1       1.25

1158 Review SRS's quality                                          3       2.00

1166 Evaluate 3apl                                                 4       2.00

1190 Study Project Management                                      2       2.00

1233 Application tier literature review                            2       4.00

1234 Application tier architecture description                     4       4.00

1242 Application tier desired properties                           3       5.00

1297 Produce RAP audit response                                    2       2.00

1298 Modifications of RAP after audit                              3       1.00

1299 Modifications of SPMP after audit                             3       0.75

1300 Modifications of SPMP after audit                             3       0.50

1390 Oversee completion of delegated tasks                         4       5.00

1398 Description of the proposed system                            1       1.00

1399 Project Domain                                                1       1.50

1400 Scenarios section                                             2       1.75

1401 High level goals: L0, L1, L2, L3                              3       2.00

1402 Introduction                                                  0.5     0.50

1403 Quality goals                                                 0.5     0.50

1404 knowledge Models                                              0.5     0.50

1405 Role Models                                                   0.5     0.50

1406 Acceptance                                                    2       0.75

1407 Change Request form                                           1       0.50

1408 Protocol Model                                                0.5     0.75

1414 TP Section                                                    4       6.50

1415 TP Section Writing                                            4       4.00

1416 Bug Tracking Tools Installation                               2       2.00

1417 TP Section Writing Testing Techniques and Tools               4       5.85

1418 Write TP Section Testing Methodology, Testing Proc...         4       4.00

1424 Modifications of SPMP after audit                             3       2.00

1425 Agent framework tech request                                  7       5.00

1426 Testing Meeting                                               1       1.00

1427 Testing Meeting                                               1       1.00

1428 Testing Meeting                                               1       1.00

1429 Testing Meeting                                               1       0.50

1431 Add references and acronyms, definitions to SADD              2       2.00

1432 Application tier roles                                        5       14.00

1433 Low level goals                                               3       4.00

1434 TP Internal Review                                            3       3.00

1435 TP Internal Review                                            3       8.00

1436 TP Internal Review                                            3       6.00

1437 TP Internal Review                                            3       4.00

1443 Testing Meeting                                               1       1.00

1444 Testing Meeting                                               1       1.00

1445 Testing Meeting (workshop for review response)                1       1.50

1446 Testing Meeting                                               1       2.00

1451 Minutes                                                       1       1.00

1456 Install Bugzilla                                              2       2.00

1457 NUnit Installation                                            2       2.00

1458 Automated Write to File for Risk Website                      4       3.00

1460 TP Post Internal Review Mods                                  3       3.00

1461 TP Post Internal Review Mods                                  3       2.00

1462 TP Post Internal Review Mods                                  3       3.00

1463 TP Post Internal Review Mods                                  3       2.00

1465 Update Risk Log                                               2       3.25

1466 Update cost benefit file                                      0.5     0.50

1467 Management Audit response                                     1.5     1.50

1468 Management Audit response                                     1.5     0.75

1469 Management Audit response                                     1.5     1.50

1470 Write up Audit Plan                                           3       3.25

1471 Produce RAP audit response                                    1       2.00

1472 Configuration Audit                                           5       6.30

1473 Configuration Audit                                           5       3.50

1474 Write up Audit Plan                                           3       2.50

1475 Configuration Audit Workshop                                  2       1.00

1476 Configuration Audit Workshop                                  2       1.00

1477 Configuration Audit Workshop                                  2       1.25

1478 Configuration Audit Workshop                                  2       1.50

1479 Configuration Audit Workshop                                  2       1.50

1480 Email PIP initiators and check follow up activtiti...         0.75    0.75

1481 Prepare for Audit walkthrough                                 1.5     3.00

1482 Arrange someone to perform RMP audit                          0.25    0.25

1483 Update website                                                1       1.25

1484 Prepare admin meeting agenda template                         0.75    0.50

1485 Audit Response for Configuration Audit                        1       1.25

1487 Modifications for SCMP after audit                            2       1.25

1489 Follow up on mini-audits                                      0.25    0.25

1490 Bluettooth (Clarinox) tech request                            5       2.00

1492 Fix up AREP                                                   1.5     4.00

1493 Risk workshop                                                 1       1.25

1494 OAA2 tech request                                             5       5.50

1495 Work out V&V tasks for the remaining iterations               0.5     0.50

1497 Risk Workshop                                                 1       1.25

1498 Work out V&V tasks for the remaining iterations               0.5     0.50

1500 Attend design/code team workshop                              1.5     1.25

1501 Preparation for Risk Meeting                                  0.5     0.50

1502 Attend design/code team workshop                              1.5     0.75

1503 Attend design/code team workshop                              1.5     1.00

1504 Attend design/code team workshop                              1.5     1.50

1505 Document Tech Request Processes                               0.5     0.50

1506 Preparation for risk workshop                                 1       0.50

1508 Collate data for meeting metrics, plot graph                  2       1.00

1509 Audit walkthrough                                             1       1.00

1510 Audit walkthrough                                             1       1.00

1511 Audit walkthrough                                             1       1.00

1512 Audit walkthrough                                             1       1.00

1513 Audit walkthrough                                             1       1.00

1514 Audit walkthrough                                             1       1.00

1516 Audit walkthrough                                             1       1.00

1517 Audit walkthrough                                             1       0.10

1518 Audit walkthrough                                             1       1.00

1519 Audit walkthrough                                             1       1.00

1524 Insert Backup procedures in to SQAP                           0.5 0.50

1525 Admin Meeting                                                 1       1.50

1526 Admin Meeting                                                 1       1.50

1527 Admin Meeting                                                 1       1.75

1528 Admin Meeting                                                 1       1.50

1530 Admin Meeting                                                 1       1.50

1533 Admin Meeting Minutes                                         1       1.00

1534 Supervisor SRS feedback meeting                               1       1.25

1535 Supervisor SRS feedback meeting                               1       1.00

1540 Fix up SS scenarios and send technical requests to...         3       3.00

1543 Attend design/code team workshop                              1.5     1.50

1544 Attend design/code team workshop                              1.5     1.50

1545 Attend design/code team workshop                              1.5     1.00

1546 Attend design/code team workshop                              1.5     1.50

1547 Attend design/code team workshop                              1.5     1.50

1548 Attend design/code team workshop                              1.5     1.50

1549 Attend design workshop                                        1.5     1.50

1550 Attend design workshop                                        1.5     1.50

1551 Attend design workshop                                        1.5     1.00

1552 Attend design workshop                                        1.5     1.50

1553 Attend design workshop                                        1.5     1.00

1554 Attend design workshop                                        1.5     1.25

1555 Re-do methodology section                                     3       3.00

1556 Detailed design on "Greeter"                        3       2.00

1557 Detailed design on "Scheduler"                      5       1.50

1558 Design goals rework                                           2       2.00

1560 Evaluate 3apl                                                 4       1.50

1561 Evaluate 3apl                                                 4       6.50

1563 Evaluate jade                                                 4       3.00

1564 Evaluate jade                                                 4       3.50

1565 Fix detailed design of Ipaq sender                            3       3.00

1566 Read SADD and provide feedback                                2.5     2.00

1567 Design workshop                                               1       1.00

1568 Design workshop                                               1       1.00

1569 Design workshop                                               1       1.00

1570 Design workshop                                               1       1.00

1571 Design workshop                                               1       1.00

1572 Internal review of SADD                                       5       8.50

1573 Detailed design on "Communicator"                   5       4.00

1574 Detailed design on "Communicator"                   5       3.50

1575 Detailed design on "Guider"                         5       1.50

1576 learn c#                                                      1       1.25

1583 Design workshop                                               1       1.00

1584 Design workshop                                               1       1.00

1585 Design workshop                                               1       1.00

1586 Design workshop                                               1       1.00

1587 Design workshop                                               1       1.00

1588 Design workshop                                               1       1.00

1591 Testing Workshop                                              2       1.50

1592 Testing Workshop                                              2       1.50

1594 report to krl                                                 1       2.00

 

                                                Difference Variance       -0.004

 

                                                 Average Difference        1.728


 

=================================================

Task Report for Week 17 (17th July to 23th July)

=================================================

 

1. Individual Commitment

------------------------

 

  Glenn Maxwell Fry:            20.00

  Ho-Jung Simon Youn:           16.50

  Soon, Saw Ai:                 14.95

  Yat Wong:                     27.50

  Carol Sin Yi Poon:            18.75

  Dom Mendonca:                 27.75

  Jian Alan Huang:              25.00

  Kieran James Simpson:         23.50

  Masyuri Jaya Tjhandana:       8.00

  Mei Ling Leong:               31.00

  Nathaporn Eiamvittayakorn:    21.85

  Wendy Wai-Tak Tsang:          13.25

  Quyen Le Quach:               25.00

                                -----

                      Total:   272.55 hours

                      Average:  20.97 hours

 

2. Estimation Report

--------------------

* Tasks allocated at start of week:      63 (Fri and Sat)

* Tasks allocated during week:           65

* Percentage allocated at the start:     49%

 

* Tasks expected to be completed:      145 (242.5 hours exp.)

* Tasks actually completed:            131 (240.59 hours)

 

* Estimated effort vs actual effort:  0.92 (222 hours vs 240.59 hours)

 

3. Sub-team Specific Report

---------------------------

                    start of week     during week

                        ----             ----

QA        Tasks           1               29

Risk      Tasks           9                1

Req.      Tasks          14                2

Design    Tasks          15                9

Meeting   Tasks          19               15

Manag.    Tasks           0                0

Coding    Tasks           5                1

Testing   Tasks           0                8

                        ---              ---

                         63               65

 

4. Overdue Tasks

----------------

Task                                    Due Date        Assigned to

CVS .NET code check in                  2004-07-16      sasoon

DECAF tech request                      2004-07-16      sasoon

Review response for SADD - Sections     2004-07-20      csypoon

Document V&V activities                 2004-07-21      neiam

Bluetooth tech request                  2004-07-21      ywong

Face recognition tech request           2004-07-21      ywong

Familiarity with Mantis                 2004-07-22      qlq

Train speech recognition                2004-07-23      sasoon

Research and Install JUnit              2004-07-23      neiam

Inspect quality of SVVP                 2004-07-23      neiam

 

5. Comments

-----------

The 49% allocation is mainly due to Wendy's away.

 

There are a number of overdue tasks, both in this week and from previous weeks.

I will approach each of the responsible party to see if I can help out.

 

--------------------------------------------------------------------------------

Appendix

 

Summary of Tasks

----------------

 ID Task Name                                                    Expect   Actual

442 final touches to the MDRS                                      10      8.50

900 Mitigate risk: Team members relax too much during ...           1      1.75

1301 Perform RMP Audit                                              5      7.00

1447 Testing Meeting                                                1      1.00

1464 Get Familiar with NUnit                                        2      0.25

1491 Document V&V activities                                        1      2.49

1523 Follow up on V&V activities                                    0.75   2.35

1539 Low level goals                                                3      7.50

1541 High level goals                                               4      3.00

1542 detection goal                                                 1      1.00

1559 Oversee completion of delegated tasks                          4      2.00

1577 Document PIP #35 in relevant documents                         0.5    4.65

1578 Document PIP #36 in relevant documents                         0.5    0.50

1579 Document PIP #37 in relevant documents                         0.5    0.50

1581 Evaluate the context toolkit                                   4      4.00

1582 Knowledge model